The Debug Sync Facility allows placement of synchronization points in the server code by using the DEBUG_SYNC macro:
open_tables(...) DEBUG_SYNC(thd, "after_open_tables"); lock_tables(...)
When activated, a sync point can
- Emit a signal and/or
- Wait for a signal
Nomenclature | Description |
---|---|
signal | A value of a global variable that persists until overwritten by a new signal. The global variable can also be seen as a "signal post" or "flag mast". Then the signal is what is attached to the "signal post" or "flag mast". |
emit a signal | Assign the value (the signal) to the global variable ("set a flag") and broadcast a global condition to wake those waiting for a signal. |
wait for a signal | Loop over waiting for the global condition until the global value matches the wait-for signal. |
By default, all sync points are inactive. They do nothing (except to burn a couple of CPU cycles for checking if they are active).
A sync point becomes active when an action is requested for it. To do so, put a line like this in the test case file:
SET DEBUG_SYNC= 'after_open_tables SIGNAL opened WAIT_FOR flushed';
This activates the sync point
'after_open_tables'
. It requests it to emit the
signal 'opened'
and wait for another thread to emit
the signal 'flushed'
when the thread's execution
runs through the sync point.
For every sync point there can be one action per thread only. Every thread can request multiple actions, but only one per sync point. In other words, a thread can activate multiple sync points.
Here is an example how to activate and use the sync points:
--connection conn1 SET DEBUG_SYNC= 'after_open_tables SIGNAL opened WAIT_FOR flushed'; send INSERT INTO t1 VALUES(1); --connection conn2 SET DEBUG_SYNC= 'now WAIT_FOR opened'; SET DEBUG_SYNC= 'after_abort_locks SIGNAL flushed'; FLUSH TABLE t1;
When conn1
runs through the
INSERT
statement, it hits the sync point
'after_open_tables'
. It notices that it is active
and executes its action. It emits the signal
'opened'
and waits for another thread to emit the
signal 'flushed'
.
conn2
waits immediately at the special sync point 'now'
for another thread to emit the 'opened'
signal.
A signal remains in effect until it is overwritten. If
conn1
signals 'opened'
before
conn2
reaches 'now'
,
conn2
will still find the
'opened'
signal. It does not wait in this case.
When conn2
reaches 'after_abort_locks'
, it signals 'flushed'
, which lets conn1
awake.
Normally the activation of a sync point is cleared when it has been executed. Sometimes it is necessary to keep the sync point active for another execution. You can add an execute count to the action:
SET DEBUG_SYNC= 'name SIGNAL sig EXECUTE 3';
This sets the signal point's activation counter to 3. Each execution decrements the counter. After the third execution the sync point becomes inactive.
One of the primary goals of this facility is to eliminate sleeps from the test suite. In most cases it should be possible to rewrite test cases so that they do not need to sleep. (But this facility cannot synchronize multiple processes.) However, to support test development, and as a last resort, sync point waiting times out. There is a default timeout, but it can be overridden:
SET DEBUG_SYNC= 'name WAIT_FOR sig TIMEOUT 10 EXECUTE 2';
TIMEOUT 0
is special: If the signal is not present,
the wait times out immediately.
When a wait timed out (even on TIMEOUT 0
), a
warning is generated so that it shows up in the test result.
You can throw an error message and kill the query when a synchronization point is hit a certain number of times:
SET DEBUG_SYNC= 'name HIT_LIMIT 3';
Or combine it with signal and/or wait:
SET DEBUG_SYNC= 'name SIGNAL sig EXECUTE 2 HIT_LIMIT 3';
Here the first two hits emit the signal, the third hit returns the error message and kills the query.
For cases where you are not sure that an action is taken and thus cleared in any case, you can force to clear (deactivate) a sync point:
SET DEBUG_SYNC= 'name CLEAR';
If you want to clear all actions and clear the global signal, use:
SET DEBUG_SYNC= 'RESET';
This is the only way to reset the global signal to an empty string.
For testing of the facility itself you can execute a sync point just as if it had been hit:
SET DEBUG_SYNC= 'name TEST';
Formal Syntax
The string to "assign" to the DEBUG_SYNC variable can contain:
RESET | <sync point name> TEST | <sync point name> CLEAR | <sync point name> {{SIGNAL <signal name> | WAIT_FOR <signal name> [TIMEOUT <seconds>]} [EXECUTE <count>] &| HIT_LIMIT <count>}
Here '&|' means 'and/or'. This means that one of the sections separated by '&|' must be present or both of them.
Activation/Deactivation
With a MariaDB for debug build, it can be enabled by a mysqld command line option:
--debug-sync-timeout[=default_wait_timeout_value_in_seconds]
'default_wait_timeout_value_in_seconds'
is the default timeout for the WAIT_FOR
action. If set to zero, the facility stays disabled.
The facility is enabled by default in the test suite, but can be disabled with:
mariadb-test-run.pl ... --debug-sync-timeout=0 ...
Likewise the default wait timeout can be set:
mariadb-test-run.pl ... --debug-sync-timeout=10 ...
The command line option influences the readable value of the debug_sync system variable.
- If the facility is not compiled in, the system variable does not exist.
- If
--debug-sync-timeout=0
the value of the variable reads as"OFF"
.
- Otherwise the value reads as
"ON - current signal: "
followed by the current signal string, which can be empty.
The readable variable value is the same, regardless if read as a global or session value.
Setting the debug_sync system variable requires the 'SUPER'
privilege. You can never read back the
string that you assigned to the variable, unless you assign the value
that the variable already has. But that would give a parse
error. A syntactically correct string is parsed into a debug sync
action and stored apart from the variable value.
Implementation
Pseudo code for a sync point:
#define DEBUG_SYNC(thd, sync_point_name) if (unlikely(opt_debug_sync_timeout)) debug_sync(thd, STRING_WITH_LEN(sync_point_name))
The sync point performs a binary search in a sorted array of actions for this thread.
The SET DEBUG_SYNC
statement adds a requested
action to the array or overwrites an existing action for the same sync
point. When it adds a new action, the array is sorted again.
A typical synchronization pattern
There are quite a few places in MariaDB and MySQL where we use a synchronization pattern like this:
mysql_mutex_lock(&mutex); thd->enter_cond(&condition_variable, &mutex, new_message); #if defined(ENABLE_DEBUG_SYNC) if (!thd->killed && !end_of_wait_condition) DEBUG_SYNC(thd, "sync_point_name"); #endif while (!thd->killed && !end_of_wait_condition) mysql_cond_wait(&condition_variable, &mutex); thd->exit_cond(old_message);
Here are some explanations:
thd->enter_cond()
is used to register the condition
variable and the mutex in thd->mysys_var
. This is
done to allow the thread to be interrupted (killed) from its
sleep. Another thread can find the condition variable to signal and
mutex to use for synchronization in this thread's THD::mysys_var
.
thd->enter_cond()
requires the mutex to be acquired
in advance.
thd->exit_cond()
unregisters the condition variable
and mutex and releases the mutex.
If you want to have a Debug Sync point with the wait, please place it
behind enter_cond()
. Only then you can safely
decide, if the wait will be taken. Also you will have
THD::proc_info
correct when the sync point emits a
signal. DEBUG_SYNC
sets its own proc_info, but
restores the previous one before releasing its internal mutex. As soon
as another thread sees the signal, it does also see the proc_info from
before entering the sync point. In this case it will be "new_message",
which is associated with the wait that is to be synchronized.
In the example above, the wait condition is repeated before the sync point. This is done to skip the sync point, if no wait takes place. The sync point is before the loop (not inside the loop) to have it hit once only. It is possible that the condition variable is signaled multiple times without the wait condition to be true.
A bit off-topic: At some places, the loop is taken around the whole synchronization pattern:
while (!thd->killed && !end_of_wait_condition) { mysql_mutex_lock(&mutex); thd->enter_cond(&condition_variable, &mutex, new_message); if (!thd->killed [&& !end_of_wait_condition]) { [DEBUG_SYNC(thd, "sync_point_name");] mysql_cond_wait(&condition_variable, &mutex); } thd->exit_cond(old_message); }
Note that it is important to repeat the test for thd->killed after
enter_cond()
. Otherwise the killing thread may kill
this thread after it tested thd->killed
in the loop
condition and before it registered the condition variable and mutex in
enter_cond()
. In this case, the killing thread does
not know that this thread is going to wait on a condition variable. It
would just set THD::killed
. But if we would not
test it again, we would go asleep though we are killed. If the killing
thread would kill us when we are after the second test, but still
before sleeping, we hold the mutex, which is registered in mysys_var.
The killing thread would try to acquire the mutex before signaling the
condition variable. Since the mutex is only released implicitly in
mysql_cond_wait()
, the signaling happens at the
right place. We have a safe synchronization.
Co-work with the DBUG facility
When running the MariaDB test suite with the
--debug-dbug
command line option, the Debug Sync
Facility writes trace messages to the DBUG trace. The following shell
commands proved very useful in extracting relevant information:
egrep 'query:|debug_sync_exec:' mysql-test/var/log/mysqld.1.trace
It shows all executed SQL statements and all actions executed by synchronization points.
Sometimes it is also useful to see, which synchronization points have
been run through (hit) with or without executing actions. Then add
"|debug_sync_point:"
to the egrep pattern.
Synchronizing DEBUG_SYNC Actions
Tests may need additional synchronization mechanisms between
DEBUG_SYNC
actions, because certain combinations
of actions can result in lost signals. More specifically, once a
SIGNAL
action is issued, it is stored in a global variable
for any waiting threads to determine if they are depending on that signal for
continuing. However, if a subsequent action overwrites that variable before a
waiting thread is able to check against it, the original signal is lost. Examples
of actions which would change the variable state are another
SIGNAL
or a RESET
. Therefore,
before issuing these commands, the test writer should verify the previous
signal has been acknowledged. The following code snippets show an
example of a problematic pattern and a potential solution.
SET DEBUG_SYNC='now SIGNAL sig'; SET DEBUG_SYNC='RESET'; # Problematic because sig can be cleared before a waiting thread can acknowledge it
SET DEBUG_SYNC='now SIGNAL sig'; # Don't issue the RESET until we have proven the waiting thread has received the signal let $wait_condition= select count(*)=0 from information_schema.processlist where state like "debug sync point%"; source include/wait_condition.inc; SET DEBUG_SYNC='RESET'; # Now this is safe